After 25 years the electrical system of the Mercy Wings International hangar is in dire need of some repairs and upgrades. Flickering lights, popping circuit breakers, shocking faucets, and smoking wires, have gotten our attention. Here in Guatemala, it is typical to use less than sufficient gauge wire to support an ever modified and increasing electrical load.

Long overdue repairs to electrical system begin. Replacing underrated wire and separating lighting and wall circuits.
Long overdue repairs to electrical system begin. Replacing underrated wire and separating lighting and wall circuits.

Several estimates were ordered, with the most reasonable cost for the project being $5,000.00 USD. With limited funds on hand, we are only able to have the initial phase of this project worked out. As this project begins to catch momentum the remaining phases can be implemented and completed.

Installing 10 AWG copper conductors, in black ABS conjuit. from the main distribution panel to a secondary panel.
Installing 10 AWG copper conductors, in black ABS conduit from the main distribution panel to a secondary panel.

Send your “tax-deductible” contributions to:

Living Water Teaching, PO BOX 1190, Caddo Mills, TX 75135. On the memo line, designate MWI Electrical.